The RG mechanical systems (HVAC, conveyor line, and hydraulic press) were inspected on April 10–13, 2026. Overall, the systems are operational but require scheduled maintenance on the main air compressor (RG-AC03) and replacement of two worn bearings in Conveyor Line B. No immediate safety hazards were identified. Estimated downtime for corrective actions: 8 hours.

The Real Grade line is a testament to the advancement of plastic molding technology. It transformed the 1/144 scale from a simple, toy-like size into a display piece capable of rivaling models twice its size. For the mecha builder, an RG kit offers the intricate satisfaction of building a machine, revealing the skeleton beneath the armor, and achieving a level of mechanical realism that brings the fiction of giant robots one step closer to reality. rg mech

| Equipment ID | Parameter | Observation | Severity | |--------------|-----------|-------------|-----------| | RG-AC03 (Compressor) | Discharge temp | 98°C (normal ≤85°C) | High – schedule repair | | Conveyor Line B | Bearing vibration | 7.2 mm/s (limit 4.5) | Medium – replace within 2 weeks | | RG-HU2 (Hydraulic unit) | Oil acidity | 2.1 mg KOH/g (new <0.5) | Medium – oil change required | | Air handling unit AHU-1 | Filter pressure drop | 320 Pa (clean filter 120 Pa) | Low – replace filter | The RG mechanical systems (HVAC, conveyor line, and